SPEH-104 High Build Epoxy Zinc-Rich Anticorrosive Primer (Passed EU CE Certification)

FOB Reference Price:Get Latest Price
$4.00 - $9.00 / Kilograms | 500 Kilogram/Kilograms (Min. Order)
Report Suspicious Activity
Overview
Quick Details
CAS No.:
FX
Other Names:
FX
MF:
FX
EINECS No.:
FX
Place of Origin:
Tianjin, China
Main Raw Material:
High Build Epoxy Zinc-Rich Anticorrosive Primer
Usage:
Building Coating, Bridge, Steel Structure
Application Method:
Spray, brush, roller
State:
Liquid Coating
Brand Name:
FUXI
Model Number:
SPEH-104
Product Name:
SPEH-104 High Build Epoxy Zinc-Rich Anticorrosive Primer
Color:
Gray
Thinner:
FXH-4 Epoxy Thinner
Mixing Ratio:
Two Components: base/hardener=10:1 by weight
Dry Film Thickness:
50μm/coat
Solid Content:
86%
Specific Gravity:
2.6
Shelf Life:
6 Months
Preferable Substrate:
Bare Steel
Applicable Subsequent Coat:
Epoxy, polyurethane, acrylic polyurethane or fluorocarbon coating
Supply Ability
Supply Ability:
12000 Ton/Tons per Year
Packaging & Delivery
Packaging Details
SPEH-104 High Build Epoxy Zinc-Rich Anticorrosive Primer (Passed EU CE Certification):
2K package: A kit 33kg contains Part A 30kg and Part B 3kg.
Port
XINGANG
Lead Time :
Within 7 workdays

 

SPEH-104 High Build Epoxy Zinc-Rich Anticorrosive Primer (Passed EU CE Certification)

 

Characteristics:

1. Good cathodic protection

2. Excellent anti-corrosion and abrasion resistance property, good high build applicability

3. Good weather resistance, fast drying

4. Good gas cutting and welding property

5. Good matching property with many kinds of subsequent coat 

6. Good adhesion to steel surfaces 

 

Uses:

Mainly be used as primer for the iron and steel structure surfaces of ships, bridges, petrochemical engineering infrastructure, container and steel structures.

 

 

 

Drying Time:

Temperature

5℃

10℃

20℃

30℃

Dry To Touch

20mins

20mins

10mins

5mins

Dry To Handle

36hrs

24hrs

18hrs

10hrs

 

Coating Interval:

Min.

24hrs

20hrs

18hrs

10hrs

Max.

 

Packaging Detail:

Shelf Life

6 months

Packing Specification

2K package: A kit 33kg contains Part A 30kg and Part B 3kg.

 

Surface Treatment:

1. The surface temperature shall be 3℃ higher than dew point.

2. Wash away salts and other water soluble contaminants with fresh water.

 

3. Remove rust, scale and damaged shop primer by sand blasting to ISO Sa2.5(SSPC-SP10).

4. The sand blasted substrate must be coated within 4 hours.

 

5. Remove the contaminants like dust with a high-pressure blower.

6. Confirm the surface clean and dry before application.

 

 

 

1. Excellent R&D team, providing you with the customized products.

2. Reasonable price and perfect after-sale service.

3. Certificates such as FDA, CE, CCS to improve competition.

4. OEM service is available.

5. Production process in full accordance with ISO 9001.

6. Timely delivery.

You May Like
Not exactly what you want? 1 request, multiple quotations Get Quotations Now >>
You May Like

Similar products in other categories: